United States18
AEP Ohio data-center large-load tariff (PUCO)
US state: Ohiotariffgrid/interconnectionin friction index
In force · effective 2025
Applies to data centres >=25 MW (and mobile data centres >=1 MW). Customers must pay for a minimum ~85% of contracted/subscribed capacity over an ~12-year term (including a multi-year ramp), demonstrate financial viability, and pay exit fees if they leave early. Approved via PUCO settlement in 2025 (Case No. 24-508-EL-ATA).
Large loads (≥25 MW) must commit to pay for about 85% of contracted capacity over roughly 12 years, show financial viability and pay exit fees, a cost and credit commitment rather than a connection ban.
Public Utilities Commission of Ohio (PUCO) ·
sourceLarge-load / data-center electricity tariff & JLARC review
US state: Virginiatariffgrid/interconnection
Proposed · effective 2024
Emerging cost-allocation and minimum-demand tariff rules for large data-centre loads. JLARC's 'Data Centers in Virginia' report (published 9 Dec 2024) found data centres materially raise grid costs; Dominion filed a proposed large-load/high-energy-use tariff at the SCC in 2025 (minimum demand charges, longer contract terms). Proceedings ongoing.
Proposed: large Virginia data-centre loads may face minimum demand charges and longer contract terms under a Dominion large-load tariff still before the SCC.
Virginia State Corporation Commission / JLARC ·
sourceQualified data center sales & use tax exemption
US state: Wisconsintax exemptiontax
In force · effective 2023
Created by 2023 Wisconsin Act 19. Minimum investment tiered by county population, roughly $50M (smaller counties) to $150M (larger counties) within 5 years. Facilities certified by the Wisconsin Economic Development Corp (WEDC).
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Wisconsin Economic Development Corp / Dept of Revenue ·
sourceData center sales/use tax exemption (ImagiNE Nebraska Act)
US state: Nebraskatax exemptiontax
In force · effective 2020
Sales/use tax exemption on qualifying data-centre property; large data-centre projects qualify at roughly $200M+ investment (with reduced/zero job requirements for very high investment tiers). Administered by Nebraska DED with the Dept of Revenue.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Nebraska Dept of Economic Development / Dept of Revenue ·
sourceData Centers Investment Program
US state: Illinoistax exemptiontax
In force · effective 2019
Exemptions on equipment, electricity, cooling, software, etc.; >=$250M capital investment + 20 full-time jobs (at 120% of county median wage) within 60 months; must obtain carbon-neutral/green (e.g. LEED) certification within 2 years. Also a 20% construction-employment income tax credit (higher in underserved areas). New certifications available through 2029.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Qualified data center sales tax exemption
US state: Indianatax exemptiontax
In force · effective 2019
IC 6-2.5-15. Investment thresholds tiered by county population, from >=$25M (smallest counties) up to >=$150M (largest) within 5 years. Exemption up to 25 years, or up to 50 years for projects investing >=$750M. Certified by the Indiana Economic Development Corp (IEDC).
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Indiana Economic Development Corp / Dept of Revenue ·
sourceHigh-technology data center equipment sales/use tax exemption (HB 696)
US state: Georgiatax exemptiontax
In force · effective 2018
Sales/use tax exemption. Minimum aggregate investment over 7 years, tiered by county population: ~$100M (smaller counties), $150M (mid), $250M (largest). A 2-year moratorium on new certifications (HB 1192, 2024) passed the legislature but was VETOED by Gov. Kemp in May 2024, so the exemption remained in effect. Statutory sunset: 31 Dec 2031.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Georgia Dept of Revenue / Dept of Economic Development ·
sourceData/technology enterprise sales & use tax exemption
US state: Mississippitax exemptiontax
In force · effective 2017
Miss. Code §57-113 (data center incentives) with sales/use tax exemptions under Title 27: qualifying enterprises generally must invest >=$50M and create >=50 jobs paying at least 150% of the state average wage. Administered by the Mississippi Development Authority with the Dept of Revenue.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Mississippi Development Authority / Dept of Revenue ·
sourceData center equipment sales & use tax exemption
US state: Michigantax exemptiontax
In force · effective 2016
MCL 205.54ee / 205.94ee. Original (2015) exemption tied to qualified/colocation data centres with statewide job commitments. 2024 legislation (PA of 2024, SB 237) added 'enterprise data centers' requiring roughly $250M investment plus clean-energy sourcing and prevailing-wage/job conditions; exemption sunset extended to 2050 (2065 for brownfield/former power-plant sites).
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Michigan Dept of Treasury ·
sourceData center sales & use tax exemption
US state: Missouritax exemptiontax
In force · effective 2015
RSMo §144.810. New data-centre project: >=$25M investment + 10 new jobs at >=150% of county average wage within 3 years (up to 25-year exemption). Expanding facility: >=$5M investment + 5 new jobs (up to 10-year exemption). Administered by the Dept of Economic Development with the Dept of Revenue.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Missouri Dept of Economic Development / Dept of Revenue ·
sourceData center partial tax abatements
US state: Nevadatax exemptiontax
In force · effective 2015
NRS 360.754. Tier 1: >=$25M capital investment + 10 new jobs (up to 10-year abatements). Tier 2: >=$100M investment + 50 new jobs (up to 20-year abatements). Sales/use tax abated to as low as 2% on eligible equipment. Administered by the Governor's Office of Economic Development (GOED).
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Nevada Governor's Office of Economic Development (GOED) ·
sourceQualifying Data Center sales & use tax exemption
US state: North Carolinatax exemptiontax
In force · effective 2015
N.C. Gen. Stat. §105-164.13(55): exemption on electricity and datacenter support equipment where at least $75M is invested in real/tangible property within 5 years of the first purchase.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
North Carolina Dept of Revenue ·
sourceComputer Data Center (CDC) Program
US state: Arizonatax exemptiontax
In force · effective 2013
TPT/use tax exemption; minimum $50M capital investment within 5 years in metro (Maricopa/Pinal) counties or $25M in other (rural) counties. Certified by Arizona Commerce Authority.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Arizona Commerce Authority ·
sourceData Center Tax Exemption
US state: Ohiotax exemptiontax
In force · effective 2013
Sales-tax exemption on qualifying data-centre equipment (ORC 122.175); minimum $100M capital investment and $1.5M annual payroll (measured over the agreement period). Term and exemption percentage set by negotiated agreement.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Ohio Dept of Development / Dept of Taxation ·
sourceQualifying Data Center sales-tax exemption
US state: Texastax exemptiontax
In force · effective 2013
Qualifying Data Center (Tax Code §151.359): single-occupant facility >=100,000 sq ft, >=$200M capital investment within 5 years, >=20 qualifying jobs at 120% of county average wage; exemption 10 years ($200M) or 15 years ($250M+). Qualifying Large Data Center Project (§151.3595): >=$500M investment, >=20 jobs, multi-tenant; 20-year exemption.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Texas Comptroller of Public Accounts ·
sourceData center equipment sales tax exemption
US state: Wyomingtax exemptiontax
In force · effective 2011
W.S. §39-15-105: exemption on purchases of data-centre computer equipment for facilities investing >=$5M; broader exemption also covering data-centre power infrastructure and back-up equipment for facilities investing >=$50M.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Wyoming Dept of Revenue ·
sourceData Center Retail Sales & Use Tax Exemption
US state: Virginiatax exemptiontax
In force · effective 2010
Sales/use tax exemption. Standard threshold: $150M capital investment + 50 new jobs (at 150% of prevailing average wage). Distressed localities: reduced to $70M investment + 25 jobs. Sunset extended to 30 Jun 2035; facilities meeting additional investment/energy-efficiency criteria extended to 30 Jun 2050 (2023 legislation).
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
Data Center Business Sales/Use Tax Exemption & Refund
US state: Iowatax exemptiontax
In force · effective 2007
Iowa Code §423.3(95). Full 100% exemption for data centre businesses investing >=$200M within 6 years; partial (50%) exemption/refund for smaller qualifying investments ($5M–$200M). Covers computers, equipment, backup power/fuel and electricity.
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.