Topics · Compare regulation

Compare data center regulation

Poland, Germany, Czechia, Slovakia and Lithuania, measure by measure. EU-wide rules are listed once. National and regional or local rules are shown side by side, each with its status, effective date and source.

MeasuresPolandGermanyCzechiaSlovakiaLithuania
EU-wide / supranational88888
National18000
Regional / local01000
Total917888
Coverage last reviewed2026-09-242026-09-24not yet re-reviewednot yet re-reviewednot yet re-reviewed

Up to 7 countries at a time. A zero means no measure was found in this compilation, not that none exists.

What was checked, per country
  • Poland (2026-09-24): Sejm ELI API and the government legislation portal checked; only the draft Energy Efficiency Act amendment (UC77, data-centre disclosure) found. No data-centre tax or grid rule found.
  • Germany (2026-09-24): Energieeffizienzgesetz read in full (§§11–17); §15–17 added to the existing §11–14 rows. No state (Land) or further municipal rules confirmed beyond Frankfurt; possible 2025/26 EnEfG amendments not checked.

EU-wide / supranational (shared)

These apply to all selected EU countries (Poland, Germany, Czechia, Slovakia and Lithuania).

MeasureType · categoryStatusEffectiveApplies toSource
Commission Delegated Regulation (EU) 2024/1364: common EU data-centre rating scheme (phase 1)
Mandates reporting of installed IT power, energy, PUE, ERF/waste-heat, WUE and renewable share via the European DC database; first round 15 Sep 2024, then annual.
Fixes the exact KPIs and data a ≥500 kW site must submit to the European database each year (first round 15 Sep 2024). It sets no performance threshold.
regulation · energy efficiencyIn force2024All selected EU countriessource
Energy Efficiency Directive (EU) 2023/1791: data centre monitoring & reporting (Art. 12)
DCs >=500 kW must annually report energy, power/water use, PUE, waste-heat reuse and renewable share. In force 10 Oct 2023; transposition by 11 Oct 2025.
Sites with ≥500 kW of installed IT power must report energy use, PUE, water, waste-heat reuse and renewable share every year to the European data-centre database. A reporting duty, with no EU-level PUE ceiling.
directive · energy efficiencyIn force2023All selected EU countriessource
Ecodesign Regulation (EU) 2019/424: servers & data storage
Minimum PSU efficiency/power factor, idle-power limits, active-state efficiency, plus material-efficiency and info requirements (secure erase, firmware updates, dismantling).
Applies to the servers and storage products installed, not to the building: equipment sold in the EU must meet PSU-efficiency, idle-power and material-efficiency requirements.
ecodesign · energy efficiencyIn force2019All selected EU countriessource
Climate Neutral Data Centre Pact (CNDCP)
Targets: PUE 1.3 (cool)/1.4 (warm) by 2025/2030; 75% renewable/CFE by 2025 & 100% by 2030; WUE and heat-reuse assessment; server circularity.
Voluntary: binds only operators that sign it to PUE (1.3/1.4), renewable-power, water and heat-reuse targets. No legal obligation on non-signatories.
self-regulatory · energy efficiencyVoluntary commitment2021All selected EU countriessource
F-Gas Regulation (EU) 2024/573
HFC quota phase-down, bans/use-restrictions on high-GWP F-gases in refrigeration/AC, leak checks, recovery and reporting, pushing DCs to low-GWP/natural refrigerants.
Phases down high-GWP refrigerants used in cooling. Drives chiller/refrigerant choices and retrofit of existing plant.
regulation · refrigerantsIn force2024All selected EU countriessource
Renewable Energy Directive III (RED III) 2023/2413
Higher renewable shares, faster permitting, heating & cooling sector targets and district-heating integration that can value DC waste heat.
Sets binding national renewable targets for member states, not duties on an individual site; indirectly eases PPAs, permitting and district-heating outlets for waste heat.
directive · renewableIn force2023All selected EU countriessource
EU Taxonomy Regulation (EU) 2020/852
CSRD companies report Taxonomy-aligned turnover/capex/opex; DC alignment hinges on energy-efficiency criteria (EU Code of Conduct/CEN-CENELEC).
No direct duty on the site: operators that report under CSRD disclose how much of their activity is taxonomy-aligned, which for data centres hinges on following the EU Code of Conduct on data-centre energy efficiency. Matters mainly for green financing.
regulation · sustainability reportingIn force2020All selected EU countriessource
Corporate Sustainability Reporting Directive (CSRD) 2022/2464
Mandatory assured disclosure of climate, energy, water, emissions, resource-use and governance; scope narrowed by 2025 Omnibus/'Stop-the-clock'.
Requires the operator to disclose energy / water / carbon data. A compliance and transparency burden rather than an operating limit.
reporting · sustainability reportingPhased2024All selected EU countriessource

National

Poland1
Draft Energy Efficiency Act amendment (UC77) – art. 36b data-centre disclosure (EED 2023/1791 transposition)
reportingenergy efficiency
Proposed · effective 2026

≥500 kW installed IT power demand; disclose owner/operator, start date, location, floor area, installed power, data traffic and storage, energy use, power utilisation, temperature setpoints, waste-heat use, water use and renewable share. Draft of 30 Sep 2025, consultation to 30 Oct 2025, last modified 7 May 2026; not yet before the Sejm.

If adopted, owners and operators of Polish data centres with ≥500 kW IT load would have to publish energy, water, waste-heat and renewable-energy data in the Public Information Bulletin (BIP) or on their website.

Minister Klimatu i Środowiska · source
Germany8
EnEfG §11: Data-centre PUE limits
regulationenergy efficiency
In force · effective 2023

Existing DCs PUE ≤1.5 from 1 Jul 2027, ≤1.3 from 1 Jul 2030; new-build (from 1 Jul 2026) ≤1.2 within two years.

Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.

BMWK / Bundesregierung · source
EnEfG §12: Energy/environmental management systems
regulationenergy efficiency
In force · effective 2023

Implement ISO 50001 or EMAS by mid-2025.

Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.

BMWK · source
EnEfG §11: Mandatory waste-heat reuse quotas
regulationheat reusein friction index
Phased · effective 2026

Min reused-energy share for new DCs: ≥10% (from Jul 2026), ≥15% (2027), ≥20% (2028).

Typical effect of this kind of measure: Obliges the facility to reuse its waste heat or limit cooling-water use. Shapes site design and can steer siting toward heat-offtake or water-rich locations.

BMWK · source
EnEfG §13–14: DC energy-efficiency register & reporting
reportingenergy efficiency
In force · effective 2024

Annual reporting of energy, PUE, waste-heat use, renewable share.

Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.

Bundesregierung (federal register) · source
EnEfG §11: 100% renewable electricity requirement
targetrenewable
Phased · effective 2024

50% renewable from 1 Jan 2024; 100% from 1 Jan 2027.

Requires a share of renewable / carbon-free electricity. Affects power sourcing, PPAs and run-cost, and can gate approval of new load.

BMWK · source
EnEfG §15 – Energy-use disclosure to colocation customers
reportingsustainability reporting
In force · effective 2024

Applies to data-centre operators serving third parties; yearly per-customer energy statement from 1 Jan 2024.

Colocation/hosting operators must give each customer an annual statement of the energy consumption attributable to them.

Bundestag / BMWK (Energieeffizienzgesetz, BGBl. 2023 I Nr. 309) · source
EnEfG §16 – Duty to avoid and reuse waste heat (companies >2.5 GWh/yr)
regulationheat reusein friction index
In force · effective 2023

Companies whose average final energy use over the last 3 years exceeds 2.5 GWh; excludes installations already covered by BImSchG permits with more specific rules.

A data centre using more than 2.5 GWh/yr must avoid waste heat to the state of the art and reuse it where technically and economically reasonable.

Bundestag / BMWK · source
EnEfG §17 – Waste-heat platform (Plattform für Abwärme) reporting
reportingheat reuse
In force · effective 2023

Companies >2.5 GWh average annual final energy use; annual submission by 31 March; updates when things change; security exceptions apply.

Data centres above 2.5 GWh/yr must report their waste heat to the federal platform every year and answer data requests from heat-network operators.

Bundesstelle für Energieeffizienz (BfEE/BAFA) · source
Czechia0

No national measures compiled.

Slovakia0

No national measures compiled.

Lithuania0

No national measures compiled.

Regional / local

Poland0

No regional / local measures compiled.

Germany1
Frankfurt/Hesse municipal DC land-use framework
Local: Frankfurt / FrankfurtRheinMainplanningzoningin friction index
In force · effective 2022

DC siting restricted to designated areas; waste-heat utilisation concept required in approvals.

Typical effect of this kind of measure: Restricts where data centers may be built. Can bar new sites outright or confine them to designated zones, directly limiting where capacity can land.

Stadt Frankfurt / Regionalverband FrankfurtRheinMain · source
Czechia0

No regional / local measures compiled.

Slovakia0

No regional / local measures compiled.

Lithuania0

No regional / local measures compiled.

Research compilation, not legal advice. Re-check each measure's status with the cited authority. Some scope and status labels have been corrected from the source compilation (for example, municipal rules that were tagged national, and voluntary pacts that were shown as in force).