Poland1
Draft Energy Efficiency Act amendment (UC77) – art. 36b data-centre disclosure (EED 2023/1791 transposition)
reportingenergy efficiency
Proposed · effective 2026
≥500 kW installed IT power demand; disclose owner/operator, start date, location, floor area, installed power, data traffic and storage, energy use, power utilisation, temperature setpoints, waste-heat use, water use and renewable share. Draft of 30 Sep 2025, consultation to 30 Oct 2025, last modified 7 May 2026; not yet before the Sejm.
If adopted, owners and operators of Polish data centres with ≥500 kW IT load would have to publish energy, water, waste-heat and renewable-energy data in the Public Information Bulletin (BIP) or on their website.
Minister Klimatu i Środowiska ·
sourceGermany8
EnEfG §11: Data-centre PUE limits
regulationenergy efficiency
In force · effective 2023
Existing DCs PUE ≤1.5 from 1 Jul 2027, ≤1.3 from 1 Jul 2030; new-build (from 1 Jul 2026) ≤1.2 within two years.
Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.
BMWK / Bundesregierung ·
sourceEnEfG §12: Energy/environmental management systems
regulationenergy efficiency
In force · effective 2023
Implement ISO 50001 or EMAS by mid-2025.
Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.
EnEfG §11: Mandatory waste-heat reuse quotas
regulationheat reusein friction index
Phased · effective 2026
Min reused-energy share for new DCs: ≥10% (from Jul 2026), ≥15% (2027), ≥20% (2028).
Typical effect of this kind of measure: Obliges the facility to reuse its waste heat or limit cooling-water use. Shapes site design and can steer siting toward heat-offtake or water-rich locations.
EnEfG §13–14: DC energy-efficiency register & reporting
reportingenergy efficiency
In force · effective 2024
Annual reporting of energy, PUE, waste-heat use, renewable share.
Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.
Bundesregierung (federal register) ·
sourceEnEfG §11: 100% renewable electricity requirement
targetrenewable
Phased · effective 2024
50% renewable from 1 Jan 2024; 100% from 1 Jan 2027.
Requires a share of renewable / carbon-free electricity. Affects power sourcing, PPAs and run-cost, and can gate approval of new load.
EnEfG §15 – Energy-use disclosure to colocation customers
reportingsustainability reporting
In force · effective 2024
Applies to data-centre operators serving third parties; yearly per-customer energy statement from 1 Jan 2024.
Colocation/hosting operators must give each customer an annual statement of the energy consumption attributable to them.
Bundestag / BMWK (Energieeffizienzgesetz, BGBl. 2023 I Nr. 309) ·
sourceEnEfG §16 – Duty to avoid and reuse waste heat (companies >2.5 GWh/yr)
regulationheat reusein friction index
In force · effective 2023
Companies whose average final energy use over the last 3 years exceeds 2.5 GWh; excludes installations already covered by BImSchG permits with more specific rules.
A data centre using more than 2.5 GWh/yr must avoid waste heat to the state of the art and reuse it where technically and economically reasonable.
EnEfG §17 – Waste-heat platform (Plattform für Abwärme) reporting
reportingheat reuse
In force · effective 2023
Companies >2.5 GWh average annual final energy use; annual submission by 31 March; updates when things change; security exceptions apply.
Data centres above 2.5 GWh/yr must report their waste heat to the federal platform every year and answer data requests from heat-network operators.
Bundesstelle für Energieeffizienz (BfEE/BAFA) ·
source