Italy2
DL 21/2026 art. 8 – single authorisation procedure for data centres (converted by L. 49/2026)
regulationzoning
In force · effective 2026
Maximum 10 months from the completeness check, extendable once by at most 3 months in exceptional cases; EIA deadlines halved; one application covers AIA, EIA, landscape, water, emissions and planning consents. In force 21 Feb 2026; converted with amendments by L. 10 April 2026 n. 49 (text in force from 19 Apr 2026).
A data centre and its grid connection get one combined permit from the integrated-environmental-permit (AIA) authority within at most 10 months, with environmental-impact deadlines halved.
Governo / MASE; regional/provincial AIA authorities ·
sourceData-centre enabling bill (DDL delega sui centri di elaborazione dati, C.1928 → S.1821)
regulationdigital policy
Proposed · effective 2026
Legislative decrees within 6 months of entry into force; principles include simplified EIA/AIA, derogations from urban-planning rules, energy self-generation, waste-heat recovery via district heating and contributions to host municipalities. Senate: in committee (last update 23 Jun 2026).
If enacted, the Government would have 6 months to adopt decrees giving data centres simplified EIA/AIA procedures, derogations from local planning rules and support for on-site generation and waste-heat reuse in district heating.
Parlamento (Camera dei deputati / Senato) ·
sourceFrance8
Reduced excise (accise) on electricity for data centres
tax relieftax
In force · effective 2019
Reduced accise rate on the electricity a data centre consumes above 1 GWh/yr, conditional on an ISO 50001 energy-management system (with further relief for electro-intensive sites).
Typical effect of this kind of measure: Lowers the cost of building or running a data center here (tax breaks, cheaper power, grants). A siting incentive: pulls investment in rather than constraining it.
DGFiP (accise on electricity transferred from DGDDI/douane in 2022) ·
sourceCode de l'énergie art. L.236-1 to L.236-3 – data-centre energy performance (loi n° 2025-391, art. 25)
regulationheat reusein friction index
In force · effective 2025
L.236-1: installed server-room power ≥500 kW → transmit administrative, environmental and energy data to the EU platform and make it public. L.236-2: ≥1 MW → valorise waste heat (derogations by decree). L.236-3: formal notice of at most 1 year, then an administrative fine of at most €50,000 per data centre. Created by loi n° 2025-391 of 30 Apr 2025; most provisions in force 1 Oct 2025.
A site with ≥500 kW of server-room power must publish its energy and environmental data; from 1 MW it must reuse its waste heat, with fines of up to €50,000 per data centre for non-compliance.
Parlement / Ministère chargé de l'énergie (DGEC) ·
sourceDécret n° 2025-1382 du 29 décembre 2025 – data-centre declaration, annual reporting and ERF ≥ 0.20 heat-reuse threshold
reportingheat reuse
In force · effective 2026
Declaration within 2 months of commissioning; administrative, environmental and energy information for the previous year by 15 May each year; deemed to valorise waste heat if ERF (Annex III of Delegated Reg. 2024/1364) ≥ 0.20, with a cost-benefit/derogation route for sites where it is not attainable. In force 1 Jan 2026.
A new site must be declared within 2 months of commissioning and report every year by 15 May; it only counts as reusing waste heat if its ERF is at least 0.20.
Gouvernement (Premier ministre; ministre chargé de l'énergie) ·
sourceLoi REEN n° 2021-1485, art. 28 – heat-reuse and water eco-conditions on the reduced electricity excise for data centres
tax relieftax
Adopted, implementing act pending · effective 2022
Amends art. 167 of loi de finances 2021: criteria go from seven to nine (valorise waste heat, e.g. via a heating/cooling network, or meet a numeric efficiency indicator set by decree; and meet a cooling-water indicator set by decree). A Senate report of Feb 2026 still called for the implementing decree.
To keep the reduced electricity excise rate, a data centre will have to reuse its waste heat or meet a decree-set efficiency indicator, and meet a cooling-water indicator.
Parlement; Ministère de l'Économie ·
sourceLoi n° 2026-403 (simplification de la vie économique), art. 35 – data centres eligible for 'projet d'intérêt national majeur'
designationzoning
In force · effective 2026
Qualification by decree where the project's purpose and scale (investment, installed power) matter for the digital or ecological transition or national sovereignty; effect limited to a State-led planning-compatibility procedure. ZAN exemption censured (Décision 2026-903 DC, 21 May 2026). Law of 26 May 2026.
A large data centre can be designated a project of major national interest by decree, letting the State align local planning documents with it; it does not by itself grant an environmental derogation.
Parlement; État (décret de qualification) ·
sourceArcep annual environmental data collection from data-centre operators (Décision n° 2024-2545)
reportingsustainability reporting
In force · effective 2024
Revenue ≥ €10M or installed IT power ≥ 100 kW (reduced set for 100–500 kW operators under €10M); energy by use, water withdrawals, artificialised land, refrigerant emissions and GHG for the previous year, due 31 March. Replaces Décision 2023-2488; published in the JO on 14 Mar 2025.
Operators with French revenue ≥ €10M or IT power ≥ 100 kW must report energy, water, land take, refrigerants and GHG data to Arcep by 31 March each year.
Arcep (homologated by ministerial arrêté) ·
sourceState identification of 63 data-centre sites and national siting guide (DGE, 2025)
designationzoning
In force · effective 2025
63 identified sites; 'Guide pour l'implantation de centres de données' (Nov 2025); support via DREETS, regional development agencies and prefectures.
Developers can target 63 pre-identified sites and get support from prefectures, DREETS and regional development agencies; ADEME can co-fund heat recovery.
Direction générale des Entreprises (Ministère de l'Économie) ·
sourceRTE fast-track connection sites and shared connection zones for data centres
designationgrid
In force · effective 2025
5 fast-track sites (4 allocated to operators meeting technical and financial requirements); shared zones of about 1,200 MW (south Île-de-France) and 500 MW (Marseille area); procedure approved by CRE.
Fast-track sites next to the 400 kV grid and shared connection zones (~1,200 MW south of Île-de-France, ~500 MW near Marseille) shorten connection times and pool network costs.
RTE (procedure approved by CRE) ·
sourceAustria1
Bundes-Energieeffizienzgesetz §72a – public KPI disclosure by data centres ≥500 kW
reportingsustainability reporting
In force · effective 2024
≥500 kW installed IT power; first by 15 May 2024, then yearly by 15 May; defence and civil-protection data centres exempt; trade secrets excluded.
Owners and operators of data centres with ≥500 kW installed IT power must publish, on their own website and every year by 15 May, their area, power, data traffic and KPIs on energy, temperature setpoints, waste-heat use, water use and renewables.
Nationalrat / BMK (BGBl. I Nr. 29/2024) ·
source