Topics · Compare regulation

Compare data center regulation

Hungary, Austria, Slovakia, Romania, Croatia and Slovenia, measure by measure. EU-wide rules are listed once. National and regional or local rules are shown side by side, each with its status, effective date and source.

MeasuresHungaryAustriaSlovakiaRomaniaCroatiaSlovenia
EU-wide / supranational888888
National010000
Regional / local060000
Total8158888
Coverage last reviewednot yet re-reviewed2026-09-24not yet re-reviewednot yet re-reviewednot yet re-reviewednot yet re-reviewed

Up to 7 countries at a time. A zero means no measure was found in this compilation, not that none exists.

What was checked, per country
  • Austria (2026-09-24): Federal and state law searched via the RIS open-data API for 'Rechenzentren': federal EEffG §72a disclosure, Lower Austria zoning, and waste-heat duties in Vienna, Upper Austria, Burgenland, Tyrol and Vorarlberg added. Other states (Styria, Carinthia, Salzburg) not confirmed.

EU-wide / supranational (shared)

These apply to all selected EU countries (Hungary, Austria, Slovakia, Romania, Croatia and Slovenia).

MeasureType · categoryStatusEffectiveApplies toSource
Commission Delegated Regulation (EU) 2024/1364: common EU data-centre rating scheme (phase 1)
Mandates reporting of installed IT power, energy, PUE, ERF/waste-heat, WUE and renewable share via the European DC database; first round 15 Sep 2024, then annual.
Fixes the exact KPIs and data a ≥500 kW site must submit to the European database each year (first round 15 Sep 2024). It sets no performance threshold.
regulation · energy efficiencyIn force2024All selected EU countriessource
Energy Efficiency Directive (EU) 2023/1791: data centre monitoring & reporting (Art. 12)
DCs >=500 kW must annually report energy, power/water use, PUE, waste-heat reuse and renewable share. In force 10 Oct 2023; transposition by 11 Oct 2025.
Sites with ≥500 kW of installed IT power must report energy use, PUE, water, waste-heat reuse and renewable share every year to the European data-centre database. A reporting duty, with no EU-level PUE ceiling.
directive · energy efficiencyIn force2023All selected EU countriessource
Ecodesign Regulation (EU) 2019/424: servers & data storage
Minimum PSU efficiency/power factor, idle-power limits, active-state efficiency, plus material-efficiency and info requirements (secure erase, firmware updates, dismantling).
Applies to the servers and storage products installed, not to the building: equipment sold in the EU must meet PSU-efficiency, idle-power and material-efficiency requirements.
ecodesign · energy efficiencyIn force2019All selected EU countriessource
Climate Neutral Data Centre Pact (CNDCP)
Targets: PUE 1.3 (cool)/1.4 (warm) by 2025/2030; 75% renewable/CFE by 2025 & 100% by 2030; WUE and heat-reuse assessment; server circularity.
Voluntary: binds only operators that sign it to PUE (1.3/1.4), renewable-power, water and heat-reuse targets. No legal obligation on non-signatories.
self-regulatory · energy efficiencyVoluntary commitment2021All selected EU countriessource
F-Gas Regulation (EU) 2024/573
HFC quota phase-down, bans/use-restrictions on high-GWP F-gases in refrigeration/AC, leak checks, recovery and reporting, pushing DCs to low-GWP/natural refrigerants.
Phases down high-GWP refrigerants used in cooling. Drives chiller/refrigerant choices and retrofit of existing plant.
regulation · refrigerantsIn force2024All selected EU countriessource
Renewable Energy Directive III (RED III) 2023/2413
Higher renewable shares, faster permitting, heating & cooling sector targets and district-heating integration that can value DC waste heat.
Sets binding national renewable targets for member states, not duties on an individual site; indirectly eases PPAs, permitting and district-heating outlets for waste heat.
directive · renewableIn force2023All selected EU countriessource
EU Taxonomy Regulation (EU) 2020/852
CSRD companies report Taxonomy-aligned turnover/capex/opex; DC alignment hinges on energy-efficiency criteria (EU Code of Conduct/CEN-CENELEC).
No direct duty on the site: operators that report under CSRD disclose how much of their activity is taxonomy-aligned, which for data centres hinges on following the EU Code of Conduct on data-centre energy efficiency. Matters mainly for green financing.
regulation · sustainability reportingIn force2020All selected EU countriessource
Corporate Sustainability Reporting Directive (CSRD) 2022/2464
Mandatory assured disclosure of climate, energy, water, emissions, resource-use and governance; scope narrowed by 2025 Omnibus/'Stop-the-clock'.
Requires the operator to disclose energy / water / carbon data. A compliance and transparency burden rather than an operating limit.
reporting · sustainability reportingPhased2024All selected EU countriessource

National

Hungary0

No national measures compiled.

Austria1
Bundes-Energieeffizienzgesetz §72a – public KPI disclosure by data centres ≥500 kW
reportingsustainability reporting
In force · effective 2024

≥500 kW installed IT power; first by 15 May 2024, then yearly by 15 May; defence and civil-protection data centres exempt; trade secrets excluded.

Owners and operators of data centres with ≥500 kW installed IT power must publish, on their own website and every year by 15 May, their area, power, data traffic and KPIs on energy, temperature setpoints, waste-heat use, water use and renewables.

Nationalrat / BMK (BGBl. I Nr. 29/2024) · source
Slovakia0

No national measures compiled.

Romania0

No national measures compiled.

Croatia0

No national measures compiled.

Slovenia0

No national measures compiled.

Regional / local

Hungary0

No regional / local measures compiled.

Austria6
NÖ Raumordnungsgesetz 2014 §§11c, 18c – dedicated 'Bauland-Sondergebiet-Rechenzentrum' zoning and state site ordinances
Regional: Lower Austria (Niederösterreich)planningzoningin friction index
In force · effective 2026

>0.5 ha only in the special zone; >3 ha only where a §11c state ordinance exists (it lapses if not zoned within 5 years, extendable by up to 3); 500 m aggregation; power supply and waste-heat use must be considered. In force 9 Jun 2026 (LGBl. 38/2026).

In Lower Austria, a data centre over 0.5 ha can only be built on land zoned 'Sondergebiet-Rechenzentrum'. Zoning over 3 ha needs a prior state site ordinance, which must secure power supply and consider waste-heat use. Facilities within 500 m of each other count together.

Land Niederösterreich (Landesregierung) · source
WERUG 2020 §10 – waste-heat use obligation for data centres >1 MW
Regional: Viennaregulationheat reusein friction index
In force · effective 2026

Nominal total energy input >1 MW; exemption only via a §7 CBA showing technical or economic infeasibility. Current version in force 17 Jul 2026 (LGBl. 28/2026).

Existing Vienna data centres over 1 MW must use their waste heat or other heat recovery, unless a cost-benefit analysis shows it is not feasible. Operators can apply for a formal finding that no obligation applies.

Land Wien · source
Oö. Energieeffizienzgesetz §§11-12 – data-centre waste-heat use and cost-benefit analysis
Regional: Upper Austria (Oberösterreich)regulationheat reusein friction index
In force · effective 2026

>1 MW nominal total energy input; CBA when new or substantially modernised. In force 1 Apr 2026 (LGBl. 29/2026).

Data centres over 1 MW in Upper Austria must use their waste heat unless a cost-benefit analysis shows it is infeasible. The CBA is mandatory for new or substantially modernised data centres.

Land Oberösterreich · source
Burgenländisches Energieeffizienzgesetz §§11-12 – data-centre waste-heat use and cost-benefit analysis
Regional: Burgenlandregulationheat reusein friction index
In force · effective 2025

>1 MW nominal total energy input. In force 30 Dec 2025 (LGBl. 105/2025).

Data centres over 1 MW in Burgenland must use their waste heat unless a cost-benefit analysis proves it infeasible. The CBA is required when new or substantially modernised.

Land Burgenland · source
Tiroler Energieeffizienzgesetz §17 – Waste-heat cost-benefit analysis for data centres >1 MW
Regional: Tyrol (Tirol)regulationheat reusein friction index
In force · effective 2026

Nominal total energy input >1 MW; new builds and substantial modernisation. In force 31 Mar 2026.

A new or substantially modernised Tyrolean data centre over 1 MW must assess waste-heat use and district-heating/cooling connection in a cost-benefit analysis that also covers heat-capturing cooling designs.

Land Tirol · source
Betreiberpflichtengesetz §12 – Waste-heat assessment for data centres >1 MW
Regional: Vorarlbergregulationheat reusein friction index
In force · effective 2026

Nominal total energy input >1 MW; new builds or substantial modernisation. Version in force from 18 Sep 2026.

Building or substantially modernising a Vorarlberg data centre over 1 MW requires an assessment of waste-heat use and district-heating/cooling connection, including heat-capturing cooling solutions.

Land Vorarlberg · source
Slovakia0

No regional / local measures compiled.

Romania0

No regional / local measures compiled.

Croatia0

No regional / local measures compiled.

Slovenia0

No regional / local measures compiled.

Research compilation, not legal advice. Re-check each measure's status with the cited authority. Some scope and status labels have been corrected from the source compilation (for example, municipal rules that were tagged national, and voluntary pacts that were shown as in force).