Topics · Compare regulation

Compare data center regulation

Estonia, Latvia and Finland, measure by measure. EU-wide rules are listed once. National and regional or local rules are shown side by side, each with its status, effective date and source.

MeasuresEstoniaLatviaFinland
EU-wide / supranational888
National003
Regional / local000
Total8811
Coverage last reviewednot yet re-reviewednot yet re-reviewed2026-09-24

Up to 7 countries at a time. A zero means no measure was found in this compilation, not that none exists.

What was checked, per country
  • Finland (2026-09-24): Electricity Tax Act and Energy Efficiency Act read on Finlex: the data-centre class II rate is repealed from 1 Jul 2026 (override applied); EED disclosure (§29f) and waste-heat duty (§29e) added.

EU-wide / supranational (shared)

These apply to all selected EU countries (Estonia, Latvia and Finland).

MeasureType · categoryStatusEffectiveApplies toSource
Commission Delegated Regulation (EU) 2024/1364: common EU data-centre rating scheme (phase 1)
Mandates reporting of installed IT power, energy, PUE, ERF/waste-heat, WUE and renewable share via the European DC database; first round 15 Sep 2024, then annual.
Fixes the exact KPIs and data a ≥500 kW site must submit to the European database each year (first round 15 Sep 2024). It sets no performance threshold.
regulation · energy efficiencyIn force2024All selected EU countriessource
Energy Efficiency Directive (EU) 2023/1791: data centre monitoring & reporting (Art. 12)
DCs >=500 kW must annually report energy, power/water use, PUE, waste-heat reuse and renewable share. In force 10 Oct 2023; transposition by 11 Oct 2025.
Sites with ≥500 kW of installed IT power must report energy use, PUE, water, waste-heat reuse and renewable share every year to the European data-centre database. A reporting duty, with no EU-level PUE ceiling.
directive · energy efficiencyIn force2023All selected EU countriessource
Ecodesign Regulation (EU) 2019/424: servers & data storage
Minimum PSU efficiency/power factor, idle-power limits, active-state efficiency, plus material-efficiency and info requirements (secure erase, firmware updates, dismantling).
Applies to the servers and storage products installed, not to the building: equipment sold in the EU must meet PSU-efficiency, idle-power and material-efficiency requirements.
ecodesign · energy efficiencyIn force2019All selected EU countriessource
Climate Neutral Data Centre Pact (CNDCP)
Targets: PUE 1.3 (cool)/1.4 (warm) by 2025/2030; 75% renewable/CFE by 2025 & 100% by 2030; WUE and heat-reuse assessment; server circularity.
Voluntary: binds only operators that sign it to PUE (1.3/1.4), renewable-power, water and heat-reuse targets. No legal obligation on non-signatories.
self-regulatory · energy efficiencyVoluntary commitment2021All selected EU countriessource
F-Gas Regulation (EU) 2024/573
HFC quota phase-down, bans/use-restrictions on high-GWP F-gases in refrigeration/AC, leak checks, recovery and reporting, pushing DCs to low-GWP/natural refrigerants.
Phases down high-GWP refrigerants used in cooling. Drives chiller/refrigerant choices and retrofit of existing plant.
regulation · refrigerantsIn force2024All selected EU countriessource
Renewable Energy Directive III (RED III) 2023/2413
Higher renewable shares, faster permitting, heating & cooling sector targets and district-heating integration that can value DC waste heat.
Sets binding national renewable targets for member states, not duties on an individual site; indirectly eases PPAs, permitting and district-heating outlets for waste heat.
directive · renewableIn force2023All selected EU countriessource
EU Taxonomy Regulation (EU) 2020/852
CSRD companies report Taxonomy-aligned turnover/capex/opex; DC alignment hinges on energy-efficiency criteria (EU Code of Conduct/CEN-CENELEC).
No direct duty on the site: operators that report under CSRD disclose how much of their activity is taxonomy-aligned, which for data centres hinges on following the EU Code of Conduct on data-centre energy efficiency. Matters mainly for green financing.
regulation · sustainability reportingIn force2020All selected EU countriessource
Corporate Sustainability Reporting Directive (CSRD) 2022/2464
Mandatory assured disclosure of climate, energy, water, emissions, resource-use and governance; scope narrowed by 2025 Omnibus/'Stop-the-clock'.
Requires the operator to disclose energy / water / carbon data. A compliance and transparency burden rather than an operating limit.
reporting · sustainability reportingPhased2024All selected EU countriessource

National

Estonia0

No national measures compiled.

Latvia0

No national measures compiled.

Finland3
Lower electricity tax class II for data centres
tax relieftax
Repealed · effective 2021

Reduced electricity excise (tax class II) for qualifying data centres meeting the size and waste-heat utilisation conditions.

No longer available from 1 July 2026: Act 1352/2025 repeals the data-centre class II rate (§4a) and its waste-heat (ERE) condition, so Finnish data centres move to the ordinary electricity tax rate.

Vero (Finnish Tax Administration) / Laki 1260/1996 sahkon valmisteverosta · source
Energiatehokkuuslaki §29f – Data-centre information duty (≥500 kW)
reportingsustainability reporting
In force · effective 2024

≥500 kW installed IT power; region published by 31 Dec 2024 and updated by 15 May of the year after any change. Act 846/2024 in force 30 Dec 2024; defence and civil-protection exemptions.

The owner or operator of a data centre with at least 500 kW installed IT power must publish the region (maakunta) where it is located on its website, on top of reporting to the EU database.

Energiavirasto (Energy Authority) / Ministry of Economic Affairs and Employment · source
Energiatehokkuuslaki §29e – Data-centre waste-heat use obligation (>1 MW)
regulationheat reusein friction index
Phased · effective 2026

Total power >1 MW; CBA also required for new or significantly refurbished sites; first CBA notice to Energiavirasto by 31 Dec 2027.

A Finnish data centre over 1 MW must use its waste heat; an existing site that uses none must prove infeasibility with a cost-benefit analysis notified to the Energy Authority, first by 31 Dec 2027.

Energiavirasto / Ministry of Economic Affairs and Employment · source

Regional / local

Estonia0

No regional / local measures compiled.

Latvia0

No regional / local measures compiled.

Finland0

No regional / local measures compiled.

Research compilation, not legal advice. Re-check each measure's status with the cited authority. Some scope and status labels have been corrected from the source compilation (for example, municipal rules that were tagged national, and voluntary pacts that were shown as in force).