Austria1
Bundes-Energieeffizienzgesetz §72a – public KPI disclosure by data centres ≥500 kW
reportingsustainability reporting
In force · effective 2024
≥500 kW installed IT power; first by 15 May 2024, then yearly by 15 May; defence and civil-protection data centres exempt; trade secrets excluded.
Owners and operators of data centres with ≥500 kW installed IT power must publish, on their own website and every year by 15 May, their area, power, data traffic and KPIs on energy, temperature setpoints, waste-heat use, water use and renewables.
Nationalrat / BMK (BGBl. I Nr. 29/2024) ·
sourceGermany8
EnEfG §11: Data-centre PUE limits
regulationenergy efficiency
In force · effective 2023
Existing DCs PUE ≤1.5 from 1 Jul 2027, ≤1.3 from 1 Jul 2030; new-build (from 1 Jul 2026) ≤1.2 within two years.
Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.
BMWK / Bundesregierung ·
sourceEnEfG §12: Energy/environmental management systems
regulationenergy efficiency
In force · effective 2023
Implement ISO 50001 or EMAS by mid-2025.
Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.
EnEfG §11: Mandatory waste-heat reuse quotas
regulationheat reusein friction index
Phased · effective 2026
Min reused-energy share for new DCs: ≥10% (from Jul 2026), ≥15% (2027), ≥20% (2028).
Typical effect of this kind of measure: Obliges the facility to reuse its waste heat or limit cooling-water use. Shapes site design and can steer siting toward heat-offtake or water-rich locations.
EnEfG §13–14: DC energy-efficiency register & reporting
reportingenergy efficiency
In force · effective 2024
Annual reporting of energy, PUE, waste-heat use, renewable share.
Typical effect of this kind of measure: Sets efficiency rules a data center must meet, e.g. a PUE ceiling or mandatory KPI reporting. Can force cooling/design changes and rule out inefficient builds.
Bundesregierung (federal register) ·
sourceEnEfG §11: 100% renewable electricity requirement
targetrenewable
Phased · effective 2024
50% renewable from 1 Jan 2024; 100% from 1 Jan 2027.
Requires a share of renewable / carbon-free electricity. Affects power sourcing, PPAs and run-cost, and can gate approval of new load.
EnEfG §15 – Energy-use disclosure to colocation customers
reportingsustainability reporting
In force · effective 2024
Applies to data-centre operators serving third parties; yearly per-customer energy statement from 1 Jan 2024.
Colocation/hosting operators must give each customer an annual statement of the energy consumption attributable to them.
Bundestag / BMWK (Energieeffizienzgesetz, BGBl. 2023 I Nr. 309) ·
sourceEnEfG §16 – Duty to avoid and reuse waste heat (companies >2.5 GWh/yr)
regulationheat reusein friction index
In force · effective 2023
Companies whose average final energy use over the last 3 years exceeds 2.5 GWh; excludes installations already covered by BImSchG permits with more specific rules.
A data centre using more than 2.5 GWh/yr must avoid waste heat to the state of the art and reuse it where technically and economically reasonable.
EnEfG §17 – Waste-heat platform (Plattform für Abwärme) reporting
reportingheat reuse
In force · effective 2023
Companies >2.5 GWh average annual final energy use; annual submission by 31 March; updates when things change; security exceptions apply.
Data centres above 2.5 GWh/yr must report their waste heat to the federal platform every year and answer data requests from heat-network operators.
Bundesstelle für Energieeffizienz (BfEE/BAFA) ·
sourceItaly2
DL 21/2026 art. 8 – single authorisation procedure for data centres (converted by L. 49/2026)
regulationzoning
In force · effective 2026
Maximum 10 months from the completeness check, extendable once by at most 3 months in exceptional cases; EIA deadlines halved; one application covers AIA, EIA, landscape, water, emissions and planning consents. In force 21 Feb 2026; converted with amendments by L. 10 April 2026 n. 49 (text in force from 19 Apr 2026).
A data centre and its grid connection get one combined permit from the integrated-environmental-permit (AIA) authority within at most 10 months, with environmental-impact deadlines halved.
Governo / MASE; regional/provincial AIA authorities ·
sourceData-centre enabling bill (DDL delega sui centri di elaborazione dati, C.1928 → S.1821)
regulationdigital policy
Proposed · effective 2026
Legislative decrees within 6 months of entry into force; principles include simplified EIA/AIA, derogations from urban-planning rules, energy self-generation, waste-heat recovery via district heating and contributions to host municipalities. Senate: in committee (last update 23 Jun 2026).
If enacted, the Government would have 6 months to adopt decrees giving data centres simplified EIA/AIA procedures, derogations from local planning rules and support for on-site generation and waste-heat reuse in district heating.
Parlamento (Camera dei deputati / Senato) ·
source