Data centers in Trinidad and Tobago
Datacenter Atlas tracks 6 facilities in Trinidad and Tobago, 2 data centers and 4 network points of presence: 0.1% of the global inventory and #81 worldwide by facility count.
Compare with another country →
MW: megawatts of power for the computers. PUE: all the electricity a site draws divided by what reaches its computers (1.0 = nothing lost). Networks present: telecom networks recorded at each site, added up. Record quality (A to D) rates the record, not the site. Glossary →
Map
Largest hubs
- Port of Spain4
- San Fernando2
A hub is a town with at least 5 facilities, with its close neighbours. Facilities in smaller towns are not listed here, so the hubs do not add up to the country total.
Top operators
All 6 facilities
Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE is disclosed for any of these sites, so the column is hidden.
| Facility | Operator | City | Networks | Record quality |
|---|---|---|---|---|
| Air Link Communications Trinidad | Air Link Communications LLC | Princes Town | 7 | B |
| Amplia DC1 | Amplia | Port of Spain | 1 | B |
| Amplia DC0 | Amplia | San Juan | 1 | B |
| Amplia DC2 | Amplia | San Fernando | 1 | B |
| Microsoft | Microsoft | Mucurapo | – | A |
| Digicel Trinidad and Tobago | Digicel Group | Port of Spain | 0 | B |
⚡ Electricity context
- Electricity demand
- 9.6 TWh (2024)
- Grid carbon intensity
- 682 gCO₂/kWh
- Renewables share
- 0.1 %
- Low-carbon share
- 0.1 %
Source: Ember yearly electricity data (CC BY 4.0). Method
Water & climate exposure
- Median baseline water stress (WRI Aqueduct, 0–5)
- 1.08
- Median riverine flood risk (0–5)
- 4.01
- Free-cooling hours ≤ 18 °C (median)
- 0 h/yr (0 %)
- Median cooling degree days
- 3,428
Derived indicators: WRI Aqueduct 4.0, GHSL, climate normals. See methodology. Method
Documented local conflicts & agreements
No documented case yet. Know one? Send it with a source.
Announced large projects
No announced project ≥ 100 MW tracked yet.
Questions
How many data centers are there in Trinidad and Tobago?
Datacenter Atlas (release 26.08-c2) records 6 facilities in Trinidad and Tobago: 2 data centers, 4 network points of presence and 0 unclassified sites. The count covers facilities documented in OpenStreetMap, PeeringDB, Wikidata and operator disclosures.
Which companies operate data centers in Trinidad and Tobago?
The operators with the most tracked facilities in Trinidad and Tobago are Amplia, Microsoft, Air Link Communications LLC, Digicel Group.
Where are data centers concentrated in Trinidad and Tobago?
The largest hubs by facility count are Port of Spain (4), San Fernando (2).
Cite this page: Datacenter Atlas (2026). Trinidad and Tobago, release 26.08-c2. https://www.datacenter-atlas.com/country/trinidad-and-tobago · ODbL / CC BY 4.0