Africa · #81 · release 26.08-c2

Data centers in Mozambique

Datacenter Atlas tracks 6 facilities in Mozambique, 4 data centers and 2 network points of presence: 0.1% of the global inventory and #81 worldwide by facility count.

Facilities
6
4 data centers · 2 network points of presence
Operating IT load (disclosed)
–
none disclosed: few operators publish it
Avg. disclosed PUE
–
none disclosed: few operators publish it
Networks present
12
0 sites host an internet exchange

Compare with another country →

MW: megawatts of power for the computers. PUE: all the electricity a site draws divided by what reaches its computers (1.0 = nothing lost). Networks present: telecom networks recorded at each site, added up. Record quality (A to D) rates the record, not the site. Glossary →

Map

loading map…
Embed this map ⧉

Free to embed with attribution (the credit link is built in).

Embed the water-stress map ⧉

Free to embed with attribution (the credit link is built in).

Largest hubs

  1. Maputo6

A hub is a town with at least 5 facilities, with its close neighbours. Facilities in smaller towns are not listed here, so the hubs do not add up to the country total.

Top operators

  1. Webmasters Lda1
  2. Teledata Mozambique1
  3. NTT1
  4. icolo1
  5. RAXIO DATA CENTRES1
  6. Digital Realty1

All 6 facilities

Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE is disclosed for any of these sites, so the column is hidden.

Rows 1–6 of 6

⚡ Electricity context

Electricity demand
16.5 TWh (2024)
Grid carbon intensity
129 gCO₂/kWh
Renewables share
83.4 %
Low-carbon share
83.4 %

Source: Ember yearly electricity data (CC BY 4.0). Method

Water & climate exposure

Water stress index (data centers, median)
35/100 v0.2 (world median 39 · Africa 48)
Data centers at high water stress (index ≥ 60)
0 of the 3 scored · 1 located at town level only is not scored
Median baseline water stress (WRI Aqueduct, 0–5)
0
Median riverine flood risk (0–5)
3.93
Free-cooling hours ≤ 18 °C (median)
1,073 h/yr (12 %)
Median cooling degree days
2,226

Derived indicators: WRI Aqueduct 4.0, GHSL, climate normals. See methodology. Method

Social friction index

22/100 · v0.3 · world median 42 · Africa 36

Main driver: Neighbourhood (97/100)

How close people live: residents within 1 km and distance to the nearest homes. High = many close neighbours.

Water
21
Energy & grid
22
Neighbourhood
97
Concentration
28
Observed conflict
0
Policy context
regulation not researched (pillar left out)

Composite of water, grid, neighbourhood, concentration, policy and observed-conflict pressure. A derived indicator: not a measurement of public opinion. Method

Documented local conflicts & agreements

No documented case yet. Know one? Send it with a source.

Announced large projects

No announced project ≥ 100 MW tracked yet.

Questions

How many data centers are there in Mozambique?

Datacenter Atlas (release 26.08-c2) records 6 facilities in Mozambique: 4 data centers, 2 network points of presence and 0 unclassified sites. The count covers facilities documented in OpenStreetMap, PeeringDB, Wikidata and operator disclosures.

Which companies operate data centers in Mozambique?

The operators with the most tracked facilities in Mozambique are Webmasters Lda, Teledata Mozambique, NTT, icolo, RAXIO DATA CENTRES.

Where are data centers concentrated in Mozambique?

The largest hubs by facility count are Maputo (6).

Cite this page: Datacenter Atlas (2026). Mozambique, release 26.08-c2. https://www.datacenter-atlas.com/country/mozambique · ODbL / CC BY 4.0