Europe · #76 · release 26.08-c2

Data centers in Moldova

Datacenter Atlas tracks 7 facilities in Moldova, 5 data centers and 2 network points of presence: 0.1% of the global inventory and #76 worldwide by facility count.

Facilities
7
5 data centers · 2 network points of presence
Operating IT load (disclosed)
–
none disclosed: few operators publish it
Avg. disclosed PUE
–
none disclosed: few operators publish it
Networks present
12
3 sites host an internet exchange

Compare with another country →

MW: megawatts of power for the computers. PUE: all the electricity a site draws divided by what reaches its computers (1.0 = nothing lost). Networks present: telecom networks recorded at each site, added up. Record quality (A to D) rates the record, not the site. Glossary →

Map

loading map…
Embed this map ⧉

Free to embed with attribution (the credit link is built in).

Embed the water-stress map ⧉

Free to embed with attribution (the credit link is built in).

Largest hubs

  1. Chisinau7

A hub is a town with at least 5 facilities, with its close neighbours. Facilities in smaller towns are not listed here, so the hubs do not add up to the country total.

Top operators

  1. Moldtelecom SA2
  2. Mezon1
  3. Trabia1
  4. AlexHost SRL1

All 7 facilities

Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE is disclosed for any of these sites, so the column is hidden.

FacilityOperatorCityNetworksRecord quality
TrabiaTrabiaChisinau11B
AlexHost, Republic of MoldovaAlexHost SRLChisinau1B
Data City - MoldtelecomMoldtelecom SAChisinau0B
Mezon Business ParkMezonChisinau0B
COLO-54 MoldtelecomMoldtelecom SAChisinau0B
Trabia-Network–Chișinău–C
IPHOST Datacenter–––C
Rows 1–7 of 7

⚡ Electricity context

Electricity demand
5.5 TWh (2025)
Grid carbon intensity
510 gCO₂/kWh
Renewables share
28.6 %
Low-carbon share
28.6 %

Source: Ember yearly electricity data (CC BY 4.0). Method

Water & climate exposure

Water stress index (data centers, median)
34/100 v0.2 (world median 39 · Europe 26)
Data centers at high water stress (index ≥ 60)
0 of the 5 scored
Median baseline water stress (WRI Aqueduct, 0–5)
1.27
Median riverine flood risk (0–5)
3.02
Free-cooling hours ≤ 18 °C (median)
6,073 h/yr (69 %)
Median cooling degree days
595

Derived indicators: WRI Aqueduct 4.0, GHSL, climate normals. See methodology. Method

Social friction index

51/100 · v0.3 · world median 42 · Europe 42

Main driver: Neighbourhood (79/100)

How close people live: residents within 1 km and distance to the nearest homes. High = many close neighbours.

Water
44
Energy & grid
47
Neighbourhood
79
Concentration
36
Observed conflict
0
Policy context
regulation not researched (pillar left out)

Composite of water, grid, neighbourhood, concentration, policy and observed-conflict pressure. A derived indicator: not a measurement of public opinion. Method

Documented local conflicts & agreements

No documented case yet. Know one? Send it with a source.

Announced large projects

No announced project ≥ 100 MW tracked yet.

Questions

How many data centers are there in Moldova?

Datacenter Atlas (release 26.08-c2) records 7 facilities in Moldova: 5 data centers, 2 network points of presence and 0 unclassified sites. The count covers facilities documented in OpenStreetMap, PeeringDB, Wikidata and operator disclosures.

Which companies operate data centers in Moldova?

The operators with the most tracked facilities in Moldova are Moldtelecom SA, Mezon, Trabia, AlexHost SRL.

Where are data centers concentrated in Moldova?

The largest hubs by facility count are Chisinau (7).

Cite this page: Datacenter Atlas (2026). Moldova, release 26.08-c2. https://www.datacenter-atlas.com/country/moldova · ODbL / CC BY 4.0