Data centers in México
Datacenter Atlas tracks 79 facilities in México, 59 data centers and 20 network points of presence: 0.9% of the global inventory and #21 worldwide by facility count.
Compare with another country →
MW: megawatts of power for the computers. PUE: all the electricity a site draws divided by what reaches its computers (1.0 = nothing lost). Networks present: telecom networks recorded at each site, added up. Record quality (A to D) rates the record, not the site. Glossary →
Map
Largest hubs
- Santiago de Querétaro24
- Mexico City14
- Monterrey6
- Mérida5
- Guadalajara4
- León4
- Toluca4
- Aguascalientes2
A hub is a town with at least 5 facilities, with its close neighbours. Facilities in smaller towns are not listed here, so the hubs do not add up to the country total.
Top operators
All 79 facilities
Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No PUE is disclosed for any of these sites, so the column is hidden.
Disclosed IT load by state / region
| State / region | MW | Figures |
|---|---|---|
| Querétaro | 332 | 2 |
| Guanajuato | 54 | 2 |
| State of Mexico | 5.1 | 1 |
Disclosed values only, campus figures counted once. Regions are assigned from each facility's coordinates (Natural Earth admin-1), so the rows add up to the national total.
⚡ Electricity context
- Electricity demand
- 356.7 TWh (2025)
- Grid carbon intensity
- 474 gCO₂/kWh
- Renewables share
- 23.1 %
- Low-carbon share
- 25.9 %
Source: Ember yearly electricity data (CC BY 4.0). Method
Water & climate exposure
- Data centers at high water stress (index ≥ 60)
- 38 of the 59 scored
- Median baseline water stress (WRI Aqueduct, 0–5)
- 4.67
- Median riverine flood risk (0–5)
- 1.29
- Free-cooling hours ≤ 18 °C (median)
- 4,523 h/yr (52 %)
- Median cooling degree days
- 413
Derived indicators: WRI Aqueduct 4.0, GHSL, climate normals. See methodology. Method
Social friction index
Main driver: Water (84/100)
Water stress at this location today and in 2050, plus drought risk (WRI Aqueduct).
- Water
- Energy & grid
- Neighbourhood
- Concentration
- Policy context
- Observed conflict
Composite of water, grid, neighbourhood, concentration, policy and observed-conflict pressure. A derived indicator: not a measurement of public opinion. Method
Regulation
1 measure recorded
See the rules on the regulation map → · Compare with neighbouring countries →
Documented local conflicts & agreements
- Querétaro residents press for water disclosure amid data center boom · 2025 · water dispute · ongoing
Announced large projects
- ODATA DC QR03 campus · ODATA (Aligned Data Centers) · partly operational · 300 MW announced
Questions
How many data centers are there in México?
Datacenter Atlas (release 26.08-c2) records 79 facilities in México: 59 data centers, 20 network points of presence and 0 unclassified sites. The count covers facilities documented in OpenStreetMap, PeeringDB, Wikidata and operator disclosures.
Which companies operate data centers in México?
The operators with the most tracked facilities in México are KIO, ATC HOLDING FIBRA MEXICO, Ascenty, MTP Sites, Triara Mty.
Where are data centers concentrated in México?
The largest hubs by facility count are Santiago de Querétaro (24), Mexico City (14), Monterrey (6), Mérida (5), Guadalajara (4).
Cite this page: Datacenter Atlas (2026). México, release 26.08-c2. https://www.datacenter-atlas.com/country/mexico · ODbL / CC BY 4.0