Middle East · #93 · release 26.08-c2

Data centers in Jordan

Datacenter Atlas tracks 4 facilities in Jordan, 2 data centers and 2 network points of presence: 0% of the global inventory and #93 worldwide by facility count.

Facilities
4
2 data centers · 2 network points of presence
Operating IT load (disclosed)
–
none disclosed: few operators publish it
Avg. disclosed PUE
–
none disclosed: few operators publish it
Networks present
11
1 site hosts an internet exchange

Compare with another country →

MW: megawatts of power for the computers. PUE: all the electricity a site draws divided by what reaches its computers (1.0 = nothing lost). Networks present: telecom networks recorded at each site, added up. Record quality (A to D) rates the record, not the site. Glossary →

Map

loading map…
Embed this map ⧉

Free to embed with attribution (the credit link is built in).

Embed the water-stress map ⧉

Free to embed with attribution (the credit link is built in).

Largest hubs

  1. Amman2
  2. Aqaba2

A hub is a town with at least 5 facilities, with its close neighbours. Facilities in smaller towns are not listed here, so the hubs do not add up to the country total.

Top operators

  1. Jordan Telecommunications Company2
  2. iLevant FZE1
  3. AL Nayi for Information and Communication Consulting Company LLC1

All 4 facilities

Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE is disclosed for any of these sites, so the column is hidden.

Rows 1–4 of 4

⚡ Electricity context

Electricity demand
23.7 TWh (2024)
Grid carbon intensity
530 gCO₂/kWh
Renewables share
24.1 %
Low-carbon share
24.1 %

Source: Ember yearly electricity data (CC BY 4.0). Method

Water & climate exposure

Median baseline water stress (WRI Aqueduct, 0–5)
5
Median riverine flood risk (0–5)
1.86
Free-cooling hours ≤ 18 °C (median)
2,985 h/yr (34 %)
Median cooling degree days
2,010

Derived indicators: WRI Aqueduct 4.0, GHSL, climate normals. See methodology. Method

Documented local conflicts & agreements

No documented case yet. Know one? Send it with a source.

Announced large projects

No announced project ≥ 100 MW tracked yet.

Questions

How many data centers are there in Jordan?

Datacenter Atlas (release 26.08-c2) records 4 facilities in Jordan: 2 data centers, 2 network points of presence and 0 unclassified sites. The count covers facilities documented in OpenStreetMap, PeeringDB, Wikidata and operator disclosures.

Which companies operate data centers in Jordan?

The operators with the most tracked facilities in Jordan are Jordan Telecommunications Company, iLevant FZE, AL Nayi for Information and Communication Consulting Company LLC.

Where are data centers concentrated in Jordan?

The largest hubs by facility count are Amman (2), Aqaba (2).

Cite this page: Datacenter Atlas (2026). Jordan, release 26.08-c2. https://www.datacenter-atlas.com/country/jordan · ODbL / CC BY 4.0