Datacenter Atlas tracks 3 facilities in Guadeloupe, 3 data centers and 0 network points of presence: 0% of the global inventory and #102 worldwide by facility count.

Facilities
3
3 data centers · 0 network points of presence
Operating IT load (disclosed)
–
none disclosed: few operators publish it
Avg. disclosed PUE
–
none disclosed: few operators publish it
Networks present
4
0 sites host an internet exchange

Compare with another country →

MW: megawatts of power for the computers. PUE: all the electricity a site draws divided by what reaches its computers (1.0 = nothing lost). Networks present: telecom networks recorded at each site, added up. Record quality (A to D) rates the record, not the site. Glossary →

Map

loading map…
Embed this map ⧉

Free to embed with attribution (the credit link is built in).

Embed the water-stress map ⧉

Free to embed with attribution (the credit link is built in).

Largest hubs

  1. Baillif1

A hub is a town with at least 5 facilities, with its close neighbours. Facilities in smaller towns are not listed here, so the hubs do not add up to the country total.

Top operators

  1. Valorem2
  2. Global Caribbean Network1

All 3 facilities

Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE is disclosed for any of these sites, so the column is hidden.

FacilityOperatorCityNetworksRecord quality
GCN BaillifGlobal Caribbean NetworkBaillif4B
ValoremValorem––B
ValoremValorem––B
Rows 1–3 of 3

⚡ Electricity context

Electricity demand
1.7 TWh (2023)
Grid carbon intensity
497 gCO₂/kWh
Renewables share
35.3 %
Low-carbon share
35.3 %

Source: Ember yearly electricity data (CC BY 4.0). Method

Water & climate exposure

Water stress index (data centers, median)
30/100 v0.2 (world median 39 · North America 37)
Data centers at high water stress (index ≥ 60)
0 of the 3 scored
Median baseline water stress (WRI Aqueduct, 0–5)
0.53
Median riverine flood risk (0–5)
1.6
Free-cooling hours ≤ 18 °C (median)
0 h/yr (0 %)
Median cooling degree days
3,453

Derived indicators: WRI Aqueduct 4.0, GHSL, climate normals. See methodology. Method

Social friction index

2/100 · v0.3 · world median 42 · North America 28

Main driver: Energy & grid (62/100)

Strain on the power system: data centers per TWh of national electricity demand, grid carbon intensity and distance to the nearest high-voltage substation.

Water
14
Energy & grid
62
Neighbourhood
15
Concentration
14
Observed conflict
0
Policy context
regulation not researched (pillar left out)

Composite of water, grid, neighbourhood, concentration, policy and observed-conflict pressure. A derived indicator: not a measurement of public opinion. Method

Documented local conflicts & agreements

No documented case yet. Know one? Send it with a source.

Announced large projects

No announced project ≥ 100 MW tracked yet.

Questions

How many data centers are there in Guadeloupe?

Datacenter Atlas (release 26.08-c2) records 3 facilities in Guadeloupe: 3 data centers, 0 network points of presence and 0 unclassified sites. The count covers facilities documented in OpenStreetMap, PeeringDB, Wikidata and operator disclosures.

Which companies operate data centers in Guadeloupe?

The operators with the most tracked facilities in Guadeloupe are Valorem, Global Caribbean Network.

Where are data centers concentrated in Guadeloupe?

The largest hubs by facility count are Baillif (1).

Cite this page: Datacenter Atlas (2026). Guadeloupe, release 26.08-c2. https://www.datacenter-atlas.com/country/guadeloupe · ODbL / CC BY 4.0