Data centers in Cabo Verde
Datacenter Atlas tracks 1 facilities in Cabo Verde, 1 data centers and 0 network points of presence: 0% of the global inventory and #134 worldwide by facility count.
Compare with another country →
MW: megawatts of power for the computers. PUE: all the electricity a site draws divided by what reaches its computers (1.0 = nothing lost). Networks present: telecom networks recorded at each site, added up. Record quality (A to D) rates the record, not the site. Glossary →
Map
Largest hubs
A hub is a town with at least 5 facilities, with its close neighbours. Facilities in smaller towns are not listed here, so the hubs do not add up to the country total.
Top operators
All 1 facilities
Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE, networks is disclosed for any of these sites, so the column is hidden.
| Facility | Operator | City | Record quality |
|---|---|---|---|
| Data Center do Estado | – | – | C |
⚡ Electricity context
- Electricity demand
- 0.5 TWh (2024)
- Grid carbon intensity
- 462 gCO₂/kWh
- Renewables share
- 30.8 %
- Low-carbon share
- 30.8 %
Source: Ember yearly electricity data (CC BY 4.0). Method
Water & climate exposure
- Free-cooling hours ≤ 18 °C (median)
- 0 h/yr (0 %)
- Median cooling degree days
- 2,414
Derived indicators: WRI Aqueduct 4.0, GHSL, climate normals. See methodology. Method
Documented local conflicts & agreements
No documented case yet. Know one? Send it with a source.
Announced large projects
No announced project ≥ 100 MW tracked yet.
Questions
How many data centers are there in Cabo Verde?
Datacenter Atlas (release 26.08-c2) records 1 facilities in Cabo Verde: 1 data centers, 0 network points of presence and 0 unclassified sites. The count covers facilities documented in OpenStreetMap, PeeringDB, Wikidata and operator disclosures.
Cite this page: Datacenter Atlas (2026). Cabo Verde, release 26.08-c2. https://www.datacenter-atlas.com/country/cabo-verde · ODbL / CC BY 4.0