80 documented events in 29 countries where communities, courts or governments pushed back on data centers, or struck a deal. 60 are contestations. Every case links to the public sources it was verified against.

How this feeds the social friction index → · Know a case we're missing? Send it with a source.

All types
80 events↓ See the list
loading map…
Skip the list of cases
opposition2026-09

What happened: other · Outcome: ongoing

South African civil groups call for data centre halt pending rights inquiry

South Africa

Civil rights groups urged a pause on new data centres until their water, land and power use is investigated; the Human Rights Commission, which opened a consultation in May 2026, reported over 250 submissions and cited poor transparency on resource demand.

waterelectricityland usetransparency
  • WTOP (Associated Press), Civil rights groups urge a halt to South Africa data centers boom amid water and power fears (2026-09-04)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-08-14

What happened: water dispute · Outcome: one part of the project refused. The permit to cool with river water was refused, not the data center.

Walloon minister refuses Google river-water cooling at Farciennes

Farciennes, Wallonia, Belgium · Google

Following a citizen appeal, the Walloon environment minister refused Google's permit change to draw about 600 cubic metres per hour from the Sambre for cooling, invoking the precautionary principle during drought; Google may appeal to the Council of State.

Announced project at this site: Google Farciennes data center campus (Ecopôle) (under construction)

water
  • Water News Europe, Belgium: Walloon minister blocks Google's use of river water for data centre (2026-08-17)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-08-13

What happened: lawsuit · Outcome: ongoing

First Nation's challenge to Wonder Valley water licence proceeds

Municipal District of Greenview, Alberta, Canada

An Alberta judge refused O'Leary Digital's bid to strike Sturgeon Lake Cree Nation's judicial review, which argues the Crown failed to consult before licensing Smoky River water for the proposed $70bn data centre park.

waterland useother
  • CBC News, First Nation wins early legal challenge on judicial review for Wonder Valley data centre project (2026-08-14)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-08-04

What happened: protest · Outcome: project approved

Lacchiarella residents protest as Italy fast-tracks K2 data center campus

Lacchiarella / Zibido San Giacomo (Milan), Lombardy, Italy · K2 Strategic Infrastructure · 400 MW stated in the source

After around 200 residents demonstrated in July over farmland, water and energy concerns, the Italian cabinet designated K2's 400MW campus near Milan a project of strategic national interest on 4 August 2026.

Announced project at this site: K2 Strategic Infrastructure hyperscale campus (Zibido San Giacomo / Lacchiarella) (permitting)

land usewaterelectricity
  • The Local Italy, Protests in Lombardy as Italy fast-tracks AI data centres (2026-08-14)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-08

What happened: petition · Outcome: ongoing

Sherbrooke residents petition against Keel data centre land sale

Sherbrooke, Quebec, Canada

More than 4,500 people signed a petition against the council's conditional land sale to Keel Infrastructure (formerly Bitfarms) for a large data centre, citing noise, environmental impact and lack of public debate; the mayor says studies are still required before any approval.

noisewatertransparencyother
  • CBC News, Plan for mega data centre in Sherbrooke, Que., raises transparency, environmental concerns (2026-08-07)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-07-22

What happened: protest · Outcome: project approved

Southland residents rally against consented Datagrid AI data centre

Makarewa (near Invercargill), Southland, New Zealand

Hundreds attended a public meeting in Invercargill to challenge Datagrid's NZ$3.5bn data centre, which received non-notified consents including groundwater take of over 600,000 litres a day; opponents objected to the lack of public input.

waternoisetransparencyelectricity
  • RNZ, Data centre opponents welcome Greens policy, warn of 'potential crisis' (2026-07-27)
  • RNZ, Massive Southland data centre's water consent concerns engineer (2026-07-20)

· ⚑ Report an error

opposition2026-07-18

What happened: protest · Outcome: ongoing

Thane residents form human chain against AWS data centre in Balkum

Thane (Balkum), Maharashtra, India · Amazon

Residents campaigning as 'Wake Up Thanekar' held a human-chain protest against a planned 53-acre AWS data centre in a dense residential area, citing heat, diesel-generator noise and emissions; Amazon said the site would not use water for cooling.

heatnoiseemissionsland use
  • VARINDIA, Amazon's Thane Data Centre Faces Resident Backlash (2026-08-14)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-06-11

What happened: permit refused · Outcome: project approved

Minister approves Tritax green belt data centre in Slough over council objection

Slough, Berkshire, United Kingdom

The housing minister approved a data centre with battery storage on a 20-acre green belt site near Heathrow after a non-determination appeal; Slough Borough Council called the scheme speculative and the wrong location.

land use
  • LocalGov, Slough BC 'disappointed' by decision over green belt data centre (2026-06-11)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-06

What happened: petition · Outcome: ongoing

Magenta residents petition against 240MW MXP data center campus

Magenta (Milan), Lombardy, Italy · Namira · 240 MW stated in the source

Residents protested a 240MW data center campus planned by Namira on the ex-Novaceta brownfield, raising grid, water-table and generator-noise concerns, filing over 100 objections and petitioning the mayor to suspend the plan.

electricitywaternoisetransparency
  • DatacenterDynamics, Locals oppose 240MW data center planned in Lombardy, Italy (2026-06-24)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-05

What happened: protest · Outcome: one part of the project refused. The dedicated gas power plant was dropped, not the data center.

Protest ends gas power plan for Edgeconnex data centre in Maintal

Maintal, Hessen, Germany · EdgeConneX

Residents and the city council opposed a dedicated gas power plant for a roughly one-billion-euro Edgeconnex data centre; the company dropped the gas plant and said it would look for other power options.

emissionselectricity
  • t-online, US-Rechenzentrum: Protest kippt geplantes Gaskraftwerk (2026-05-11)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-04-14

What happened: lawsuit · Outcome: ongoing

NAACP sues xAI over unpermitted turbines for Colossus 2

Southaven, Mississippi, United States · xAI

The NAACP, represented by SELC and Earthjustice, filed a federal Clean Air Act suit alleging xAI runs 27 gas turbines without air permits to power its Colossus 2 data center near South Memphis.

Announced project at this site: xAI Colossus 2 (Memphis / Southaven power) (partly operational), xAI Colossus 1 (Memphis) (operational), xAI MACROHARDRR (Southaven) (under construction)

emissionshealth

Only one source so far: treat this case with more caution.

· ⚑ Report an error

mixed2026-04-08

What happened: referendum or vote · Outcome: project approved with conditions

Coweta approves Project Sail after moratorium

Coweta County, Georgia, United States

Following a May-December 2025 moratorium and new data center rules, county commissioners voted 3-2 to rezone 829 acres for a large campus with 17 conditions such as buffers, road improvements and decommissioning, over resident concerns about Wahoo Creek and river water.

waterland usebiodiversity
  • FOX 5 Atlanta, Coweta County approves massive 'Project Sail' data center (2026-04-08)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-04-02

What happened: lawsuit · Outcome: project approved

Versailles appeal court rejects associations' challenge to CyrusOne Wissous data center

Wissous (Essonne), Île-de-France, France · CyrusOne · 60 MW stated in the source

Local and environmental associations argued the Wissous data center was split into phases to avoid the 50 MW environmental authorisation threshold; the Versailles administrative appeal court dismissed their challenge, and the associations said they would go to the Conseil d'État.

noiseelectricitytransparencyhealth
  • DCMag, La cour d'appel de Versailles rejette le recours contre le datacenter de CyrusOne à Wissous (2026-04-13)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-03-27

What happened: permit refused · Outcome: project stopped. The council denied the application, which it found incomplete.

Archbald council denies 18-building data center campus

Archbald, Lackawanna County, Pennsylvania, United States

Archbald's borough council voted 5-0 to deny an 18-building, roughly 400-acre data center campus, citing an incomplete application lacking power, water, sound and traffic studies, before more than 200 residents.

land usenoisewaterelectricity
  • WVIA, Archbald denies 18-building data center campus during special Friday afternoon meeting (2026-03-27)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

mixed2026-03

What happened: grid restriction · Outcome: moratorium active

Energinet pauses new grid connection agreements amid data center demand surge

Denmark

Denmark's state grid operator Energinet temporarily stopped signing new connection agreements after roughly 60 GW of requests, largely from data centers and other big users, piled up; operators warned a long pause could stall investment.

electricity
  • CNBC, Denmark faces data center reckoning amid power grid strains (2026-05-04)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-03

What happened: lawsuit · Outcome: ongoing

Government concedes judicial review of Iver green belt data centre approval

Iver, Buckinghamshire, United Kingdom

After Buckinghamshire Council refused the scheme twice and ministers approved it, environmental groups brought a judicial review; the government conceded a flaw in EIA screening, so the permission is expected to be quashed and redetermined.

land usebiodiversity
  • Gowling WLG, Government concedes Buckinghamshire data centre judicial review: implications for data centres (2026-03-20)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026-02

What happened: referendum or vote · Outcome: project stopped. The council ended the planning talks for the campus.

Groß-Gerau council votes against Vantage 160MW data centre

Groß-Gerau, Hessen, Germany · Vantage · 160 MW stated in the source

The town council voted 18-14 not to continue planning talks for a 2.5-billion-euro, 160MW Vantage campus, citing limited local tax benefit, a fresh-air corridor and the scale of the buildings.

Announced project at this site: Vantage Groß-Gerau campus (Lausböhl industrial park) (paused)

taxland uselandscape
  • hessenschau.de, Internetknoten Rhein-Main: Groß-Gerau sagt Nein zu diesem XXL-Rechenzentrum (2026-02-04)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026

What happened: protest · Outcome: ongoing

Dalit farmers resist land acquisition for Google AI hub near Visakhapatnam

Tarluvada (Visakhapatnam), Andhra Pradesh, India · Google · 1,000 MW stated in the source

Dalit families and farmers in Tarluvada have protested acquisition of land for a 1 GW Google AI data centre whose foundation stone was laid in April 2026, disputing compensation and raising water concerns in a water-stressed region.

Announced project at this site: Google India AI Hub (Visakhapatnam) (under construction)

land usewater
  • The Business Standard, Giant data centre over land belonging to Dalits sparking protests in Andhra Pradesh (2026-06-01)

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026

What happened: protest · Outcome: ongoing

Hino citizens' group opposes Mitsui Fudosan data center; buildings scaled down

Hino, Tokyo, Japan · Mitsui Fudosan

A citizens' group in Hino, western Tokyo, is campaigning against a three-building data centre over fire, heat and noise risks; the developer cut two buildings' height by a fifth to 63.5 m and plans a green buffer zone.

landscapenoiseheathealth

Only one source so far: treat this case with more caution.

· ⚑ Report an error

opposition2026

What happened: lawsuit · Outcome: ongoing

Inzai residents sue over building certificate for new data center

Inzai, Chiba, Japan

Residents of Inzai, which already hosts at least ten data centres, took legal action against the certificate issued by inspection firm Japan ERI for a proposed facility, citing loss of sunlight, landscape damage, noise, hot air and traffic.

landscapenoiseheathealth

Only one source so far: treat this case with more caution.

· ⚑ Report an error

Method

Candidate events were identified with web searches (English and local-language press, government and court sites) across four regional sweeps (US/Canada, north-west Europe, southern/northern Europe, rest of world). An event was kept only if at least one source URL was fetched during research and its content confirmed the date, place, event type and outcome recorded; unconfirmable candidates were dropped. Summaries are written in neutral own words. Coordinates are municipality or region centroids from OpenStreetMap Nominatim unless a site is known (location precision says which). Links to inventory facilities (facility links) are made automatically for site-level events only, when operator and location match unambiguously. The list is a documented sample, not an exhaustive census.

Licence CC BY 4.0. Cite: Datacenter Atlas (2026). Conflict atlas. https://www.datacenter-atlas.com/conflicts