Data centers in Mannheim
9 tracked facilities in Mannheim, 5 data centers and 3 network points of presence (1 unclassified), hosting 17 network presences. Announced large projects within 50 km: 2, up to 656 MW as stated by developers.
This hub groups 5 neighbouring municipalities: Mutterstadt (2), Heidelberg (2), Bensheim (2), Ludwigshafen am Rhein (1), Mannheim (1), plus 1 facilities with no town recorded that lie nearby.
Near Mannheim: water, local friction, conflicts and projects →Autour de Mannheim (en français) →
How Mannheim scores as a location
- Water stress index · median of 5 data centers (few: one site can move it)
- 19/100 · low
- Social friction index · median of 5 data centers (few: one site can move it)
- 20/100 · below average
Both describe the place, not the operators: a higher water score means scarcer water, a higher friction score more of the conditions that tend to come before local opposition. The nearby tool reads the single nearest facility, so its figures can differ from these medians by a few points. Methods: water stress index · social friction index.
Announced large projects within 50 km (2)
- NTT DATA Frankfurt 6 (FRA6) campus, Nierstein · NTT DATA (NTT Global Data Centers) · permitting · 482 MW announced
- Vantage Groß-Gerau campus (Lausböhl industrial park) · Vantage Data Centers · paused · 174 MW announced
Stated by developers, not measured (≥ 100 MW or ≥ USD 1 bn). All projects in Germany →
Operators in Mannheim
Other hubs in Germany
Documented local conflicts & agreements near Mannheim
- opposition Groß-Gerau council votes against Vantage 160MW data centre · 2026-02
All 9 facilities
Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE is disclosed for any of these sites, so the column is hidden.