Data centers in Madrid
34 tracked facilities in Madrid, 28 data centers and 5 network points of presence (1 unclassified), hosting 567 network presences, with 70 MW of disclosed operating IT load (1 site). Announced large projects within 50 km: 3, up to 440 MW as stated by developers.
This hub groups 7 neighbouring municipalities: Madrid (21), Alcobendas (4), Pozuelo de Alarcón (2), Alcalá de Henares (2), San Fernando de Henares (1), Las Rozas de Madrid (1), Getafe (1), plus 2 facilities with no town recorded that lie nearby.
Near Madrid: water, local friction, conflicts and projects →Autour de Madrid (en français) →
How Madrid scores as a location
- Water stress index · median of 28 data centers
- 72/100 · above average
- Social friction index · median of 28 data centers
- 79/100 · above average
Both describe the place, not the operators: a higher water score means scarcer water, a higher friction score more of the conditions that tend to come before local opposition. The nearby tool reads the single nearest facility, so its figures can differ from these medians by a few points. Methods: water stress index · social friction index.
Announced large projects within 50 km (3)
- Apto Madrid campus (Fuenlabrada) · Apto · under construction · 240 MW announced
- Ferrovial Alcobendas data center campus (MAD 01) · Ferrovial · permitting · 100 MW announced
- Nabiax ADC3, Alcalá de Henares campus · Nabiax · under construction · 100 MW announced
Stated by developers, not measured (≥ 100 MW or ≥ USD 1 bn). All projects in Spain →
Operators in Madrid
Other hubs in Spain
Documented local conflicts & agreements near Madrid
No documented case within 60 km. Know one? Send it with a source.
All 34 facilities
Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No PUE is disclosed for any of these sites, so the column is hidden.