Data centers in Batam
7 tracked facilities in Batam, 6 data centers and 1 network points of presence, hosting 75 network presences. Announced large projects within 50 km: 1, up to 360 MW as stated by developers.
This hub groups 2 neighbouring municipalities: Batam (6), Kota Batam (1).
Near Batam: water, local friction, conflicts and projects →Autour de Batam (en français) →
How Batam scores as a location
- Water stress index · median of 6 data centers (few: one site can move it)
- 35/100 · below average
- Social friction index · median of 6 data centers (few: one site can move it)
- 30/100 · below average
Both describe the place, not the operators: a higher water score means scarcer water, a higher friction score more of the conditions that tend to come before local opposition. The nearby tool reads the single nearest facility, so its figures can differ from these medians by a few points. Methods: water stress index · social friction index.
Announced large projects within 50 km (1)
- DayOne Kabil Tech Park campus (Firmus AI cluster) · DayOne · under construction · 360 MW announced
Stated by developers, not measured (≥ 100 MW or ≥ USD 1 bn). All projects in Indonesia →
Operators in Batam
Other hubs in Indonesia
Documented local conflicts & agreements near Batam
- mixed Singapore ends 2019 data centre moratorium with selective approvals · 2022-01-11
All 7 facilities
Sorted by disclosed IT load, then networks present. A row opens the full, source-linked record on the map. No IT load, PUE is disclosed for any of these sites, so the column is hidden.